Project : Greater Rochester Intrernational Airport Taxiway Relocations

Monroe County -- Greater Rochester International Airport, Rochester, New York

The project is located on the south side of the airport between Runway 7-25 and Scottsville Road. The project will construct new stub taxiways perpendicular to Taxiway ‘F’ while eliminating old service roads and some locations of old apron pavement. A portion of the airfield security fence will be removed while relocating an aircraft gate. Construction will include approximately 7,200 tons of full-depth bituminous asphalt pavement, approximately 9,500 cubic yards of crushed aggregate base, unclassified excavation and embankment in place, and improvement and construction of the closed drainage system. The project will also install an edge lighting system along the new taxiways, new signage and pavement markings. 

Services Provided by CHA:
  • Engineering Design
  • Construction Inspection
  • Construction Administration