Taunton River Gas Distribution Main Replacement

CHA provided engineering and permitting services to abandon, remove and replace two natural gas distribution mains along the bottom of the Taunton River between Fall River and Somerset, with one 12-inch steel pipe. Horizontal direction drilling (HDD) was selected for the installation of the new pipe to limit environmental impacts. The 1,900-foot HDD alignment also considered the surrounding community and included limited work space for construction to reduce impacts to nearby businesses and traffic.

Project Services:
  • Design
  • Permitting
  • Topographic, Geophysical and Hydrographic Surveys
  • Environmental Assessments (Wetlands and Habitat)
  • Diver Observation of Pipe Conditions
  • Geotechnical Investigation and Laboratory Testing
  • HDD Alignment and Route Assessment, Including Stress Analysis
  • Construction and Permit Drawings
  • Construction Administration